Detached ADU
A standalone structure, sometimes called a backyard cottage or guest house, separate from the main home. It needs its own foundation, framing, and utility connections, so it tends to be the largest of these projects.
An ADU, or accessory dwelling unit, is a second, self-contained living space on the same lot as your home, with its own kitchen, bath, and entrance. The contractors you see here are already licensed, insured, and vetted, so you pick the one you want and your request goes to that one. Free for homeowners.
Every contractor here is licensed, insured, and vetted before they're listed. You pick the one you want, and your request goes to that one.
An ADU is a complete, independent home in miniature on your property. It can be built a few different ways, and the path you take depends on your lot and what you already have:
A standalone structure, sometimes called a backyard cottage or guest house, separate from the main home. It needs its own foundation, framing, and utility connections, so it tends to be the largest of these projects.
An addition that shares a wall with your existing home. It ties into the structure you already have and can sometimes use utility connections that are already close by.
Turning an attached or detached garage into a living space. It is the most common ADU because the shell already exists, though it still needs insulation, plumbing routed through the slab, and the garage opening framed in.
Carving a unit out of existing space inside the home, usually a basement or attic. The work centers on safety: floor reinforcement, egress, soundproofing, and separate heating and cooling.
A smaller unit, capped at 500 square feet, built inside the home with its own entrance and a compact kitchen. It can share a bathroom with the main house, and it often comes with an owner-occupancy rule.
Bringing an older, unpermitted space up to code so it can be permitted, often after an inheritance or a code-enforcement notice.
// ADU Construction work by vetted pros
Most ADU projects start with a change in the family. A parent needs a place of their own nearby. An adult child is moving back. Someone wants to age in the family home with help close at hand, or to stay on the property while renting out the larger house. Others build to bring in rental income. Whatever starts it, a handful of questions tend to come up first:
That depends on local zoning, setbacks, and the size of your home, and the rules vary a lot by city and state. A good contractor checks your specific jurisdiction before promising anything.
You can usually rent it. You generally cannot sell it on its own, because an ADU is tied to the main home and the lot, not a separate parcel.
Sometimes, and sometimes not. An older electrical panel or a small water line may need upgrading to carry the added load, which is one of the bigger swing factors in the budget.
Yes, ADUs are permitted work, and the contractor should pull the permit, not ask you to pull it in your name. A push to pull it yourself is a sign to slow down.
A vetted ADU contractor should welcome these questions and answer them straight. The vetting here checks the license, the insurance, and the standing up front, so the contractors you are choosing from can already speak to them.
Two ADUs of the same size can land at very different numbers, and a few things explain most of the gap. The type matters first: a detached unit with its own foundation and utility trenching usually costs more than a garage or interior conversion that reuses an existing shell. Utilities are the quiet driver. If your electrical panel, water line, or sewer connection cannot carry a second unit, upgrading them adds real cost, and a backyard that slopes the wrong way can mean a pump system instead of a simple gravity sewer line. Access plays in too: a tight side yard that heavy equipment cannot reach pushes labor up. And the soft costs that homeowners often forget, the engineering, the soil testing, the permit and utility fees, regularly run a fifth to a third of the whole budget.
If you need a way to pay for the work, financing options are available through trusted lending partners. You choose what works for you, there is no pressure, and the platform stays free for homeowners.
An ADU is a small house, with structure, plumbing, electrical, and utility tie-ins all in one project, so the contractor you pick matters more than any single design choice. A few things are worth checking before you commit:
Building an ADU usually calls for a general building contractor license, active and in the right classification. You can verify the license directly on your state's contractor licensing board, and confirm the name on the license matches the company you are talking to.
General liability and workers' compensation protect you if something goes wrong on site. Ask to see current certificates.
If you are building for an aging parent, some contractors hold an aging-in-place certification that shows training in features like zero-threshold entries and roll-in showers. It is not required, but it tells you something.
Scope, schedule, how changes are priced, and what is warranted and for how long, all in writing, with payments tied to milestones rather than a large sum up front.
The warning signs are consistent.
This is the part the platform is built to take off your plate. Our ADU contractors are vetted before they can join, by people who spent their careers in the trades and know how to judge a contractor's license, insurance, record, and work. We are a platform that connects you with contractors; the contractor owns the project and the relationship. You get a shorter, safer list, and the choice stays yours.
Start your project →A few terms and a couple of myths that come up on most ADU projects:
The engineering, soil testing, permit fees, and utility tap fees that come before any building starts. They are easy to forget and they regularly run a fifth to a third of the total, so a budget that counts only construction is usually short.
Some ADU types, junior ADUs in particular, require the owner to live in either the main home or the unit. Whether that applies depends on your state and city.
People often assume a backyard ADU can be split off and sold separately. Under standard zoning it cannot; it stays tied to the main home and the lot.
Many homeowners think they have to pay for independent gas, water, and electric meters. In many places you can branch off the main home's lines instead and use a private submeter to track the unit's use, which avoids the larger municipal meter costs.
A common worry is that an ADU changes the look of the neighborhood. Most are garage conversions or backyard units set behind the main home, so they tend to be hard to see from the road.
// Vetted, licensed, insured
Every ADU contractor here is licensed, insured, and vetted before they're listed. You pick the one you want, and your request goes to that one. Your information is not sold to a list of companies who race to call you.
Start your project, choose your area, and see the vetted contractors near you.
Start your project →Usually not. An ADU is tied to the main home and the lot, so under standard zoning it cannot be sold on its own. You can generally rent it out.
Sometimes. If your electrical panel, water line, or sewer connection cannot carry a second unit, it may need upgrading, and that is one of the larger swing factors in the cost. A contractor checks this for your specific property before quoting.
The contractor doing the work should pull it. If a contractor pushes you to pull the permit yourself under owner-builder status, treat it as a warning sign, because it shifts the legal and financial liability onto you.
Yes. The platform is free for homeowners, always. You choose your contractor and connect with them directly.